Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Initialising ...
Suzuki, Mitsutoshi
Risk Assessment, p.133 - 151, 2018/02
A integrated risk assessment could be developed to promote synergism between safety, security, and safeguards (3S). One of the synergies of the integrated 3S risk assessment is a 3S by Design approach for new nuclear facilities. In safety, the classical probabilistic risk assessment (PRA) has been developed to estimate the frequency of severe accident using the basic event frequency. Because of recent concern about nuclear security, a vital area identification method based on the ETs/FTs has been explored to protect vital areas of nuclear power plants against sabotage. The different difficulty in applying risk assessment to safeguards is determining the initiation of diversion of nuclear material and misuse, because the diversion of nuclear material and misuse of technology are induced by the motivation of states and intentional acts of facility operation. In this chapter, a balance among 3S risk would be explored to pursue an optimal and a cost-effective management.
Nakamura, Hironobu; Shimizu, Yasuyuki; Makino, Risa; Mukai, Yasunobu; Ishiyama, Koichi; Kurita, Tsutomu; Ikeda, Atsushi*; Yamaguchi, Katsuhiro*
Proceedings of INMM 57th Annual Meeting (Internet), 9 Pages, 2016/07
Regarding the Integrated Safeguards (IS) in Japan, the implementation of IS has been started on September 2004, and the concept has been introduced to the JNC-1 facilities since August 2008. Then, random interim inspection with short notice and reducing person-days of inspection (PDI) was introduced instead of traditional scheduled IIV in order to improve deterrence of the nuclear material diversion with timeliness goal. And it was agreed that it should be evaluated and reviewed because RII was designed when inter-campaign. In JAEA, we decided to restart PCDF campaign to reduce potential safety risks of reprocessing facilities. To adopt the RII scheme to the process operation in campaign, JAEA proposed a new scheme to JSGO and IAEA without increasing PDI and reducing detection probability. As a result of the discussion, it was agreed and successfully introduced since March 2014. The new scheme for PCDF consists of scheduled inspection (fixed-day RII), reduction of estimated material for the verification, implementation of remote monitoring with data provision, improvement of operational status check list, introduction of NRTA and MC&A data declaration with timeliness. Though the operator's workloads for information provision were increased, we could manage to balance IS requirement with implementation of our operation successfully. This contribution was helped to safeguards implementation and our operation for 2 years.
Naito, Kaoru; Ogawa, Tsuyoshi*; Osabe, Takeshi*
Proceedings of 42nd INMM Annual Meeting, 12 Pages, 2001/00
no abstracts in English
Nishimura, Hideo; Nishizawa, Satoshi
Dai-14-Kai Kaku Busshitsu Kanri Gakkai (INMN) Nihon Shibu Nenji Taikai Rombunshu, p.155 - 162, 1993/11
no abstracts in English